Waterwatch Data Portal
CO_TEA030 Tea Tree Creek @ Elaine-Morrison Rd
26 June 2010
Site visit details
Overview
Catchment | Moorabool River |
---|---|
Site | Tea Tree Creek @ Elaine-Morrison Rd CO_TEA030 |
Date and Time | Saturday 26th June 2010 11:00am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 40 | 4.6 | 570 | 7.6 | 0.075 | 9 | 9 | 200 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
cloudy, rained 15.6 mm last week, 6.2 mm last 24 hours, not flowing, muddy, >0 m deep, 1 m wide. No water flowing from drain, litter: packets, bottles, cans, plastic. Hazards: broken bridge rail, risk: fall. Measures: avoid rail, collect water from side of bridge. Photo take of broken bridge. Reactive phosphorus diluted 1:5. (0.015 X 5). Water was too muddy to see colours.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au