Site visit details

Overview

Catchment Goulburn River
Site Upper Blackwood Ck at Cathedral Lane, Taggerty GB_UBL010
Date and Time Sunday 16th April 2006 18:10pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units Rain mm Water ° C Tota mg/L P mg/L Turb NTU
Sample 57 11.7 30
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
med flow cool autumn day after 2 days of rain max 15C

Creatures Waterwatch method

Image Species Score Quantity
Total bug score
Total abundance 0 - 35 35+
0 - 200 Poor Good
200+ Fair Very good
Total abundance: 0 Total score: 0 Overall rating: Poor

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au