Site visit details

Overview

Catchment Genoa River
Site Devlins Creek - Below pumping station EG_DEV040
Date and Time Saturday 14th October 2006 08:40am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 1345 6.5 0.03 16.5 13.5 50
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Low tide 9.30am High clouds 'shoal' pattern 75% coverage, very light breeze No apparent flow at sample site - but can be observed further on. Colour a murky red/brown with light scum on the surface

Creatures Waterwatch method

Image Species Score Quantity
Total bug score
Total abundance 0 - 35 35+
0 - 200 Poor Good
200+ Fair Very good
Total abundance: 0 Total score: 0 Overall rating: Poor

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au