Waterwatch Data Portal
EG_DOU060 Double Creek - Nature trail end of boardwalk
2 September 2006
Site visit details
Overview
Catchment | Genoa River |
---|---|
Site | Double Creek - Nature trail end of boardwalk EG_DOU060 |
Date and Time | Saturday 2nd September 2006 12:30pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 799 | 6.1 | 0.015 | 15.5 | 10.5 | 10 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Weather Conditions: Fine, warm, light wind. Comments/Notes: Creek flowing, bottom covered with fine red brown colloidal flocs ( iron oxide from soil) Photos.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au