Waterwatch Data Portal
EG_MOR090 Macleod Morass - Outlet
13 September 2000
Site visit details
Overview
Catchment | Mitchell River |
---|---|
Site | Macleod Morass - Outlet EG_MOR090 |
Date and Time | Wednesday 13th September 2000 15:00pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Temp DIff ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 700 | 6.6 | 0.03 | 22.5 | 13 | 0.09 | 25 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
25 mm across the weir into the morass. Large carp between the weir and the road tunnel grid.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au