Waterwatch Data Portal
EG_MOR090 Macleod Morass - Outlet
2 July 2003
Site visit details
Overview
Catchment | Mitchell River |
---|---|
Site | Macleod Morass - Outlet EG_MOR090 |
Date and Time | Wednesday 2nd July 2003 13:30pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Temp DIff ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 7300 | 7.4 | 0.08 | 10.5 | 11 | 0.12 | 16 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
60cm across the weir. High on the river side. Pools on the morass side became connected, after the rain, but the level rose more on the river side.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au