Waterwatch Data Portal
GB_UBL010 Upper Blackwood Ck at Cathedral Lane, Taggerty
21 January 2017
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Upper Blackwood Ck at Cathedral Lane, Taggerty GB_UBL010 |
Date and Time | Saturday 21st January 2017 16:50pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | Rain mm | Water ° C | Tota mg/L | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 52.5 | 4.9 | 19.8 | 36.8 | 30 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Stream condition was high after the storm.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au