Site visit details

Overview

Catchment Bunyip River
Site Main Creek at the Noxon property ME_EMI100
Date and Time Monday 8th August 2016 08:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.01 87.42 9.5 952 6.8 0.05 12 11.5
Weather sunny
Last rainfall During the last week 10.00
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth Other:15 cm
Stream width Other:2 m
Hazards
Litter/Pollutants

Dissolved O%: 90

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au