Site visit details

Overview

Catchment Loddon River
Site Lake Tom Thumb Eaglehawk NC_LBE001
Date and Time Wednesday 29th February 2012 15:20pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 420 7.4 0.15 21.5 21.8 40
Weather cloudy
Last rainfall During the last week 62.2
Flow estimate Not Flowing
Water Appearance Muddy
Stream depth
Stream width Unknown
Hazards
Litter/Pollutants
Salinity levels are alot lower than previous test, water is flowing over the spillway, recent rains have increased the re-active phosphorus levels.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au