Site visit details

Overview

Catchment Bunyip River
Site Tanti Creek at Stones Crossing ME_ETN600
Date and Time Saturday 28th March 2009 10:55am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FAU Turb NTU
Sample 8 6410 0.01 7.1 18 16.3 5
Weather Sunny
Last rainfall Last 3 days
Flow estimate Normal base flow
Water Appearance
Stream depth 30.00
Stream width 0.75
Hazards
Litter/Pollutants
Less than 0.5mm rain. Photos taken. Numerous small fish (unusual at this site). Two springs oozing metallic looking water over bank and into waterway as usual.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au