Site visit details

Overview

Catchment Bunyip River
Site Tanti Creek at Stones Crossing ME_ETN600
Date and Time Friday 25th January 2008 15:00pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FAU Turb NTU
Sample 10 7100 5 6.6 30.3 22.8
Weather Sunny
Last rainfall More than a week ago
Flow estimate Slow
Water Appearance
Stream depth 5.00
Stream width 1.00
Hazards
Litter/Pollutants
Smelly - dying veg and wet leaves. Scummy down stream. Weeds removed so an increase of sun at the creek. Shopping trolleys not visible. Still slimy discharge from springs flowing into water as noted in 2007.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au