Site visit details

Overview

Catchment Bunyip River
Site Tanti Creek at Stones Crossing ME_ETN600
Date and Time Saturday 5th March 2011 11:20am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FAU Turb NTU
Sample 6 3340 0.01 7.5 20 16.5 7
Weather Sunny
Last rainfall Last 24 hrs
Flow estimate Fast
Water Appearance
Stream depth 30.00
Stream width 1.20
Hazards
Litter/Pollutants
Low creek level but flowing; the split fallen cyprus reported fallen on northern bank, still not cleared by MW. Looking good with shallow pools but sides muddy from recent rains and high stream level. Both springs flowing into creek slowly.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au