Waterwatch Data Portal
CO_WAU012 Waurn Ponds Creek @ Cobbin Farm
22 November 2009
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Waurn Ponds Creek @ Cobbin Farm CO_WAU012 |
Date and Time | Sunday 22nd November 2009 16:15pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 80 | 7.5 | 220 | 7.4 | 0.17 | 16.5 | 17 | 0.18 | 103 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
cloudy, rained 57.5 mm during last 24 hours, rapid flow, muddy appearance, 2 m deep and 3 m wide. Litter - bottles, plastic, polystyrene creek in flood over bridge stage height - - 5cm ( 5cm above bridge starting point- creek in flood) flow velocity - 18 sec in 10 metres
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au