Site visit details

Overview

Catchment Goulburn River
Site Jims Gully at Creightons Creek GB_JIM010
Date and Time Sunday 16th May 2010 12:00pm
Approved Approved

Notes

Physical Chemical Tests

No physical chemical tests recorded on this visit
EC µS/cm pH pH Units Rain mm Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Rainfall ~60mm to 24th April, and ~24mm end April early May EC very similar to April Turbidity mostly lower than April pH for CRE002 - 7.0, CRE012 - 7.6 and CRE015- 7.3 inconsistent - meter??????? Note from KJH, John's technique and meter were checked at QAQC on 24th of June and found to be Okay. Hodgy explained this variation is normal

Creatures Waterwatch method

Image Species Score Quantity
Total bug score
Total abundance 0 - 35 35+
0 - 200 Poor Good
200+ Fair Very good
Total abundance: 0 Total score: 0 Overall rating: Poor

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au