Site visit details

Overview

Catchment Yarra River
Site Blackburn Lake at the Landing, a constructed platform on the edge of the lake ME_YGR020
Date and Time Sunday 5th August 2012 10:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.07 46 5 240 7 0.01 14 10 29
Weather windy
Last rainfall During the last week 3
Flow estimate
Water Appearance Clear
Stream depth 51cm - 99cm
Stream width >5m
Hazards
Litter/Pollutants bottles,plastic
Inlet Creek under Friends Bridge very low, no sign of pollution. Wattle pollen floating on water

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au