Site visit details

Overview

Catchment Goulburn River
Site Baronga Creek at Creightons Creek GB_BAR010
Date and Time Sunday 21st October 2012 12:00pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Air ° C Water ° C Coli orgs/100mL P mg/L Turb FTU Turb NTU
Sample 120 12
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Rainfall ~ 12mm in September, 20mm in October. EC slightly increased over September at most sites. Turbidity mostly ~ same as September. RAM005 up and CRE014 down.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au