ISC Reaches ISC Map Portal

Reach details Options
28_2 Devilbend Creek 23.7km Sites 8
28_3 Balcombe Creek 11.3km Sites 5

Active Sites 1

Site details

ME_ETU045 Tuerong Creek at Old Moorooduc Road

Active Water Authority Basin 28_2 Devilbend Creek 01-02-2016 - 10-03-2017 14 Site Visits

Catchment Snapshot

The catchment snapshot uses site samples to show the median values for the period over each reach of the river.

More details can be found in the Index of Stream Condition report relevant to this region

Chart filters

Reach location

Reach values

Reach 28_2 28_3
Ammonium mg/L NH4+
Dissolved Oxygen % Saturation % 50.0
Dissolved Oxygen mg/L mg/L 7.5
Electrical Conductivity µS/cm 885.5
Gauge Board Height m 0.3
Nitrate - Nitrogen mg/L N
pH pH Units 8.3
Reactive Phosphate (mg/L) mg/L P
Temperature - AIR ° C 11.0
Temperature - WATER ° C 20.1
Turbidity - NTU NTU 20.0
Total sites in reach 8 5
Total visits in period 39 0