Site visit details

Overview

Catchment Goulburn River
Site Dry Creek at McKenzies Bridge, Hamilton Street, Broadford GB_DRY025
Date and Time Tuesday 24th November 2015 10:15am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N pH pH Units Rain mm rP mg/L P Air ° C Water ° C P mg/L Turb NTU
Sample 630 0 15.3 0.11 42
Weather sunny
Last rainfall During the last week 2.2
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance Stained brown
Stream depth
Stream width
Hazards
Litter/Pollutants
Local runoff after rain - lower EC than DRY020, brown stain

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au