Site visit details

Overview

Catchment Goulburn River
Site Sunday Creek at driveway into 110 Ashes Bridge Track, Hilldene. GB_SUN023
Date and Time Monday 15th December 2014 11:30am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm Rain mm Air ° C Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 15 1.3 1120 740 0 31.6 23.4 2420 25
Weather sunny
Last rainfall
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
E.coli and Total Phosphorus sample taken. Stagnant. flow disconnected at bridge.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au