Site visit details

Overview

Catchment Goulburn River
Site Baronga Creek at Creightons Creek GB_BAR010
Date and Time Sunday 20th January 2013 12:00pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Air ° C Water ° C Coli orgs/100mL P mg/L Turb FTU Turb NTU
Sample 130 6.3 15
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Rainfall ~ 3mm on 19-12-12. EC increases at sites from CRE008 downstream. Turbidity slightly lower at most sites except CRE008 and PEA010.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au