Site visit details

Overview

Catchment Yarra River
Site Blackburn Lake at the Landing, a constructed platform on the edge of the lake ME_YGR020
Date and Time Sunday 1st July 2012 10:05am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.3 68 8 250 7.6 0.02 7 8 26
Weather overcast
Last rainfall Raining Now
Flow estimate
Water Appearance Muddy,Other: almost clay-coloured
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards
Litter/Pollutants paper,polystyrene
Difficult to get an accurate reading for Ammoia because of ater colour, repeated later, see results for 12/7/2012

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au