Waterwatch Data Portal
ME_YGR020 Blackburn Lake at the Landing, a constructed platform on the edge of the lake
7 May 2012
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Blackburn Lake at the Landing, a constructed platform on the edge of the lake ME_YGR020 |
Date and Time | Monday 7th May 2012 14:15pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.12 | 88 | 9 | 200 | 7.3 | 0.01 | 13 | 13.5 | 32 |
Weather | cloudy |
---|---|
Last rainfall | During the last week |
Flow estimate | |
Water Appearance | Muddy |
Stream depth | 51cm - 99cm |
Stream width | |
Hazards | |
Litter/Pollutants | paper,plastic |
Also cigarette buts in water. Sample warmed to 25 degrees. diluted 1:1 for ammonia reading
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au