Site visit details

Overview

Catchment Yarra River
Site Blackburn Lake at the Landing, a constructed platform on the edge of the lake ME_YGR020
Date and Time Monday 7th May 2012 14:15pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.12 88 9 200 7.3 0.01 13 13.5 32
Weather cloudy
Last rainfall During the last week
Flow estimate
Water Appearance Muddy
Stream depth 51cm - 99cm
Stream width
Hazards
Litter/Pollutants paper,plastic
Also cigarette buts in water. Sample warmed to 25 degrees. diluted 1:1 for ammonia reading

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au