Waterwatch Data Portal
NE_COR075 Corryong Creek, Lamberts Road Bridge +200m up
9 March 2020
Site visit details
Overview
Catchment | Upper Murray River |
---|---|
Site | Corryong Creek, Lamberts Road Bridge +200m up NE_COR075 |
Date and Time | Monday 9th March 2020 10:45am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Water ° C | P mg/L | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 75.1046 | 6.8 | 90 | 8.26 | 0.083 | 20.2 | 110 |
Weather | sunny |
---|---|
Last rainfall | During the last 24 hours 10.00 |
Flow estimate | FLOOD / OVERBANK: flow is high and water level has exceeded bank capacity and is connecting with floodplain |
Water Appearance | Stained brown |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Sunny warm day. Rained last night 10mm. Lots of rain past week. Evidence of flooding. Site 2m up at site. dark brown water
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au