Waterwatch Data Portal
NC_BUL120 Bullock Creek: Upper Spring Ck Landcare, B3
1 November 2019
Site visit details
Overview
Catchment | Loddon River |
---|---|
Site | Bullock Creek: Upper Spring Ck Landcare, B3 NC_BUL120 |
Date and Time | Friday 1st November 2019 14:30pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 5200 | 7 | 0.02 | 35.5 | 25.5 | 11 |
Weather | cloudy |
---|---|
Last rainfall | More than a week ago 1.50 |
Flow estimate | POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected) |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | rocks |
Litter/Pollutants | bottles,paper,plastic,waxed cardboard,cans,packets,other: insulation batts |
The sampling at this point was conducted earlier than normal because there was a significant rainfall event forecast a few days ahead. This sampling was to measure the baseline values before the flush of water that was expected after the rain event.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au