Waterwatch Data Portal
NC_BUL120 Bullock Creek: Upper Spring Ck Landcare, B3
6 November 2019
Site visit details
Overview
Catchment | Loddon River |
---|---|
Site | Bullock Creek: Upper Spring Ck Landcare, B3 NC_BUL120 |
Date and Time | Wednesday 6th November 2019 09:50am |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 5500 | 7 | 0.01 | 18.5 | 14 | 13 |
Weather | cloudy |
---|---|
Last rainfall | During the last week 33.00 |
Flow estimate | POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected) |
Water Appearance | Clear,Stained brown,Oily |
Stream depth | 51cm - 99cm |
Stream width | 2m - 5m |
Hazards | rocks |
Litter/Pollutants | bottles,paper,plastic,waxed cardboard,cans,packets,other: insulation batts |
This sample point was tested today, only 6 days on from the previous test, because of the significant rainfall that had taken place since then. This was to see if the rain produced any reduction in the high EC readings from 6 days ago. However there was no stream flow.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au