Site visit details

Overview

Catchment Loddon River
Site Bendigo Ck - Violet Street Footbridge NC_BGO025
Date and Time Wednesday 13th February 2019 15:30pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 1094 9.1 0.1 24 9
Weather cloudy
Last rainfall During the last 24 hours 2.00
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Stained brown
Stream depth 0 - 50cm
Stream width < 2m
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au