Site visit details

Overview

Catchment Goulburn River
Site Lake Bartlett near outlet at North End GB_LBT007
Date and Time Thursday 20th October 2016 10:10am
Approved Approved

Notes

Physical Chemical Tests

Chem mg/L D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 35 56 5.4 47 241 6.6 6 14.4 0.17 154
Weather
Last rainfall
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants

High levels of turbidity possibly due to high winds.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au