Waterwatch Data Portal
EG_FOR Forge Creek, Barkhill Rd - Site 4
28 October 2016
Site visit details
Overview
Catchment | Lake Victoria |
---|---|
Site | Forge Creek, Barkhill Rd - Site 4 EG_FOR |
Date and Time | Friday 28th October 2016 12:10pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 2330 | 7.43 | 5.9 |
Weather | sunny |
---|---|
Last rainfall | During the last week 48.20 |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Clear |
Stream depth | 51cm - 99cm |
Stream width | > 5m |
Hazards | |
Litter/Pollutants |
Upstream discharge from East Gippsland Water's sewage treatment plant, winter lagoon - estimated flow 80 litres/second (basis info from EGW);
Discharge analysis : pH 7.41, EC 2970 microS/cm, phosphorus 6.67 mg/l P, indicating essentially no in-stream dilution of the discharge;
Both discharge and in-stream samples had to be diluted 10:1 to obtain in-range PO4 meter reading;
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au