Site visit details

Overview

Catchment Goulburn River
Site Creightons Creek u/s of Threlful Creek GB_CRE002
Date and Time Sunday 16th October 2016 12:00pm
Approved Approved

Notes

Physical Chemical Tests

E coli orgs/100mL EC µS/cm pH pH Units Rain mm Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 100 12.5 20
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants

Rainfall: 145 mm  between 18th Sept and 16th Oct 2016

EC: mostly higher than September, lower at CRE013 and CRE014

Turbidity: lower at all Creightons Ck sites, higher at RAM005 and BAR010

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au