Site visit details

Overview

Catchment Latrobe River
Site Gippsland Drain No 3 - Settlement Rd Kilmany WG_DRN003
Date and Time Monday 26th September 2011 14:30pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % EC µS/cm GB Height m pH pH Units rP mg/L P Air ° C Water ° C P mg/L Turb NTU
Sample 680 7.3 0.75 19.4 18.7 87
Weather sunny
Last rainfall During the last week 6.5
Flow estimate Moderate
Water Appearance Muddy
Stream depth
Stream width
Hazards
Litter/Pollutants
Irrigation season, Strong flowing. Sample diluted 1:25 ie: 2ml sample, 48ml distilled water

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au