Site visit details

Overview

Catchment Goulburn River
Site Baronga Creek at Creightons Creek GB_BAR010
Date and Time Sunday 17th April 2011 00:00am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Air ° C Water ° C Coli orgs/100mL P mg/L Turb FTU Turb NTU
Sample 120 12
Weather
Last rainfall During the last week
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Rainfall: 25mm since 20th March, 50mm in April to 17th. EC: Slightly lower. Turbidity: Despite rain in week before (28.6mm on Sunday prior 10/04/11, elders website) turbidity lower at all sites excepts CRE002, probably due to ground cover reducing run off.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au