Site visit details

Overview

Catchment Yarra River
Site Blackburn Lake at the Landing, a constructed platform on the edge of the lake ME_YGR020
Date and Time Sunday 1st July 2007 10:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 7.5 120 8.2 13 10 400
Weather Overcast
Last rainfall Last 24 hrs
Flow estimate n/r
Water Appearance
Stream depth 50.00
Stream width
Hazards
Litter/Pollutants
10mm last 24/48hr. very heavey rain last wed/thurs. water so turbid that can't test turbidity. Reported to Keith Loveridge at council 3/7/07. Noticed high turbidity coming from drain for last week.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au