Site visit details

Overview

Catchment Bunyip River
Site Balcombe Creek at Two Bays Road (Site 3), Mt Eliza ME_EBA260
Date and Time Saturday 14th June 2008 11:00am
Approved Approved

Notes

Physical Chemical Tests

No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Air ° C Water ° C Turb NTU
Sample
Weather Overcast
Last rainfall Last 3 days
Flow estimate Normal base flow
Water Appearance
Stream depth 20.00
Stream width
Hazards
Litter/Pollutants
heavy rains in past 3 days. Lots of green and water flowing smoothly. Low light, cold 10 degrees air temp.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au