Site visit details

Overview

Catchment Bunyip River
Site Eel Race drain inlet to Seaford Wetlands ME_ESE100
Date and Time Sunday 2nd September 2007 13:00pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Air ° C Water ° C Turb NTU
Sample 10 0.03 7 17.5 20
Weather Sunny
Last rainfall Last 3 days
Flow estimate Permanent
Water Appearance
Stream depth 5.00
Stream width
Hazards
Litter/Pollutants
The polystyrene balls are no longer present.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au